Fuel line.
Today me and Jeff have been working on a fuel line pipe. We started the Job three weeks ago but we always got interrupted of other jobs . So now we can finely go back to that pipe.
Now its just to connect the two pieces with a long pipe going threw two bulk heads. That mens a lot of cutting also.
This pipe goes down to a fuel tank and its for metering the fuel level. The pipe ho was there before had a gap between a connecting pipe so the sounding rod got stuck. They had to cut it to get it out.
This is for a different system . A new pipe was welded in to an old line.The old line is now longer in yous.
Jeff cut the old pipe and welded on a cap so that we can clean out the pipe if we need to.
Now its just to connect the two pieces with a long pipe going threw two bulk heads. That mens a lot of cutting also.
This pipe goes down to a fuel tank and its for metering the fuel level. The pipe ho was there before had a gap between a connecting pipe so the sounding rod got stuck. They had to cut it to get it out.
This is for a different system . A new pipe was welded in to an old line.The old line is now longer in yous.
Jeff cut the old pipe and welded on a cap so that we can clean out the pipe if we need to.
The pipe to the right is the one he cut out . Its solid with dirt ( from old toalets =)
0 Comments:
Legg inn en kommentar
<< Home